Use the minimum total slack (Min TS) heuristic to schedule the resource-constrained project. If a tie occurs,
Question:
Use the minimum total slack (Min TS) heuristic to schedule the resource-constrained project. If a tie occurs, use minimum activity duration to break the tie.
Units of resource type 1 available = 10 Units of resource type 2 available = 15