Estimate the amount of time required for a carpenter to do the following job: Cut an opening
Question:
Estimate the amount of time required for a carpenter to do the following job: Cut an opening through the exterior wall of a wood-framed, single-story house (built in 1965), with a wood siding exterior, and a gypsum drywall finish inside, and install a wood casement window, 3 ft x 4ftin size. Assume a Wood lintel is needed.
Show all details of your estimate.