Allocations using simplified costing versus activity-based} costing {Similar to Self-Study Problem} Devine and O'Clock, architects, have been

Question:

Allocations using simplified costing versus activity-based} costing

{Similar to Self-Study Problem}

Devine and O'Clock, architects, have been using a simplified costing system in which all professional labor costs are included in a single direct cost category (professional labor) and all overhead costs are included in a single indirect cost pool (professional support) and allocated to jobs using professional labor hours as the allocation base. Consider two clients: Shank Products, which required 50 hours of design work for a new addition; and Sayers Markets, which required plans for a new store that took 20 hours to draw. The firm has two partners who each earn a salary of \(\$ 150,000\) a year and four associates who each earn \(\$ 60,000\) per year. Each professional has 1,500 billable hours per year. The professional support is \(\$ 590,000\), which consists of \(\$ 350,000\) of design support and \(\$ 240,000\) of staff support. Shank's job required 30 hours of partner time and 20 hours of associate time. Sayers' job required 5 hours of partner time and 15 hours of associate time.

{Required:}

1. Prepare job cost sheets for Shank Products and Sayers Markets, using a simplified costing system with one direct and one indirect cost pool.

2. Prepare job cost sheets for the two clients, using an activity-based costing system with two direct cost categories (partner labor and associate labor) and two indirect cost categories (design support and staff support). Use professional labor dollars as the cost allocation base for design support and use professional labor hours for staff support.

Fantastic news! We've Found the answer you've been seeking!

Step by Step Answer:

Related Book For  book-img-for-question

Principles Of Cost Accounting

ISBN: 9780324374179

14th Edition

Authors: Edward J. Vanderbeck

Question Posted: