1. 7.21 Two alternatives, identified as X and Y, are evaluated using the B/C method. Alternative Y...

Question:

1. 7.21 Two alternatives, identified as X and Y, are evaluated using the B/C method. Alternative Y has a higher total cost than X. If the B/C ratios are 1.2 and 1.0 for alternatives X and Y, respectively, which alternative should be selected? Why?