10-29. What is the conventional BC ratio for the flood control project? (a) 1.53 (b) 1.33 (c)...

Question:

10-29. What is the conventional B–C ratio for the flood control project?

(a) 1.53

(b) 1.33

(c) 1.76

(d) 2.20

(e) 4.80