4. A municipal solid-waste site for a city must be located at Site A or Site B....

Question:

4. A municipal solid-waste site for a city must be located at Site A or Site B. After sorting, some of the solid refuse will be transported to an electric power plant where it will be used as fuel. Data for the hauling of refuse from each site to the power plant are shown in Table P2-4.

TABLE P2-4 Table for Problem 2- 4 Site A Site B Average hauling distance 3 miles 4 miles Annual rental fee for solid-waste site $100,000 $60,000 Hauling cost $2/yd3-mile $2/yd3-mile If the power plant will pay $8.00 per cubic yard of sorted solid waste delivered to the plant, where should the solid-waste site be located? Use the city’s viewpoint and assume that 150,000 cubic yards of refuse will be hauled to the plant for one year only. One site must be selected. (2.1)

Fantastic news! We've Found the answer you've been seeking!

Step by Step Answer:

Related Book For  book-img-for-question

Engineering Economy

ISBN: 9781292265001

17th Global Edition

Authors: William G. Sullivan ,Elin M. Wicks ,C. Patrick Koelling

Question Posted: