The overhead rate for Machine Setups is $100 per setup. Products A and B have 80 and
Question:
The overhead rate for Machine Setups is $100 per setup. Products A and B have 80 and 60 setups, respectively.
The overhead assigned to each product is:
(a) Product A $8,000, Product B $8,000.
(b) Product A $8,000, Product B $6,000.
(c) Product A $6,000, Product B $6,000.
(d) Product A $6,000, Product B $8,000.