What is Well’s predetermined manufacturing overhead rate?
Well Corporation’s manufacturing of computers. Assume that Well
• Allocates manufacturing overhead based on machine hours.
• Budgeted 11 million machine hours and \($91\) million of manufacturing overhead costs.
• Actually used 14 million machine hours and incurred the following actual costs (in millions)
a. $8.27/machine hour
b. $5.79/machine hour
c. $7.36/machine hour
d. $6.50/machine hour