The plant manager has asked you to analyze the cost of electricity used in the manufacturing facility.

Question:

The plant manager has asked you to analyze the cost of electricity used in the manufacturing facility. Information for 2004 and 2005 follows:

image text in transcribed

Required: Using the high-low method, determine the following:

a. The variable rate for electricity per machine hour.

b. The total fixed cost of electricity.

c. The estimated cost of electricity for next year if machine hours are expected to be 122,500.