. An X chart is used to maintain current control of a process. The cost parame- ters...
Question:
. An X chart is used to maintain current control of a process. The cost parame-
ters are 21 = $2, Q2 = $0.50,
a) = $50, aj = $75, and a= = $200. A single assignable cause occurs, with magni-
tude 5 = 1, and the run length of the process in control is exponentially dis-
tributed with mean 100 h. It requires 0.05 h to sample and test, and 1 h to locate the assignable cause.
(a) Evaluate the cost of the arbitrary ₮
chart design n = 5, k = 3, and h = 0.5.
(b) Find the economically optimum design.