The cost formulas for variable overhead costs in a machining operation are as follows: During August, the
Question:
The cost formulas for variable overhead costs in a machining operation are as follows:
During August, the machining operation was scheduled to work 11,250 machine-hours and to produce 4,500 units of product. The standard machine time per unit of product is 2.5 hours. A strike near the end of the month forced a cutback in production. Actual results for the month were:
Required
Prepare an overhead performance report for the machining operation for August. Use column headings in your report as shown below: