Learning curve, cumulative average-time learning curve. (20 minutes) Geneve Dfense Systemes manufactures radar systems. It has just
Question:
Learning curve, cumulative average-time learning curve. (20 minutes) Geneve Défense Systemes manufactures radar systems. It has just completed the manufacture of its first newly designed system, RS-32.
It took 3,000 direct manufacturing labour-hours (DMLH) to produce this one unit. Geneve Défense Systemes believes that a 90% cumulative average-time learning model for direct manufacturing labour-hours applies to RS-32. (A 90% learning curve implies g = —0.1520.) The variable costs of producing RS-32 are
REQUIRED Calculate the total variable costs of producing 2, 4 and 8 units. njy7