A manufacturing company makes two types of water skis, a trick ski and a slalom ski. The
Question:
A manufacturing company makes two types of water skis, a trick ski and a slalom ski. The trick ski requires 6 labor-hours for fabricating and 1 labor-hour for finishing. The slalom ski requires 4 labor-hours for fabricating and 1 labor-hour for finishing. The maximum labor-hours available per day for fabricating and finishing are 108 and 24, respectively. If x is the number of trick skis and y is the number of slalom skis produced per day, write a system of linear inequalities that indicates appropriate restraints on x and y. Find the set of feasible solutions graphically for the number of each type of ski that can be produced.
Step by Step Answer:
Finite Mathematics For Business Economics Life Sciences And Social Sciences
ISBN: 9780134862620
14th Edition
Authors: Raymond Barnett, Michael Ziegler, Karl Byleen, Christopher Stocker