A firm allocates staff into four categories: welders, fitters, designers and administrators. It is estimated that for

Question:

A firm allocates staff into four categories: welders, fitters, designers and administrators. It is estimated that for three main products the time spent, in hours, on each item is given in the following matrix.

Boiler Water tank 2 1.4 Designer 0.3 Admin 0.1 Welder Fitter 0.75 0.5 0.1 0.25 The wages, pension

Write the problem in matrix form and use matrix products to find the total cost of producing 10 boilers, 25 water tanks and 35 frames.