A time study was conducted on a job that contains four tasks. Tire observations and performance ratings
Question:
A time study was conducted on a job that contains four tasks. Tire observations and performance ratings for six cycles are shown in tire following table.
b. Calculate the normal time for each task.
c. Assuming an allowance factor of 15 percent of workday, calculate the standard time for this job.