An assembly line with 17 tasks is to be balanced. The longest task is 2.4 minutes, and
Question:
a. What are the minimum and maximum cycle times?
b. What range of output is theoretically possible for the line?
c. What is the minimum number of workstations needed if the maximum output rate is to be sought?
d. What cycle time will provide an output rate of 125 units per day?
e. What output potential will result if the cycle time is (1) 9 minutes? (2) 15 minutes?