Peter Rourke, a loan processor at Royal Bank, has been timed performing four work elements, with the

Question:

Peter Rourke, a loan processor at Royal Bank, has been timed performing four work elements, with the results shown in the following table. The allowances for tasks such as this are personal, 7%; fatigue, 10%; and delay, 3%.

Observations (minutes) Performance Rating (%) 110 95 Task Element 3 5 1 0.4 0.6 0.6 0.5 0.6 0.4 0.4 2 3 0.8 0.6 0.7 0.7


a) What is the normal time?
b) What is the standard time?