Prepare a master production schedule for industrial pumps in the manner of Figure in the chapter. Use
Question:
Prepare a master production schedule for industrial pumps in the manner of Figure in the chapter. Use the same inputs as the example, and lot sizes of 70, but change the MPS rule from “schedule production when the projected on- hand inventory would be negative without production” to “schedule production when the projected on- hand inventory would be less than 10 without production.”
Fantastic news! We've Found the answer you've been seeking!
Step by Step Answer:
Answer rating: 100% (QA)
Given Use the industrial pumps information fromFigure 1111 June July 1 2 3 4 5 6 7 8 Forecast 30 30 ...View the full answer
Answered By
Jonas Araujo
I have recently received the degree of PhD. In Physics by the Universidade Federal do Maranhão after spending a term in Durham University, as I have been awarded a scholarship from a Brazilian mobility program. During my PhD. I have performed research mainly in Theoretical Physics and published works in distinguished Journals (check my ORCID: https://orcid.org/0000-0002-4324-1184).
During my BSc. I have been awarded a scholarship to study for a year in the University of Evansville, where I have worked in detection-analysis of photon correlations in the the Photonics Laboratory. There I was a tutor in Electromagnetism, Classical Mechanics and Calculus for most of that year (2012).
I am very dedicated, honest and a fast learner, but most of all, I value a job well done.