Table 10-23 shows the tasks required to assemble an aluminum storm door and the length of time
Question:
Table 10-23 shows the tasks required to assemble an aluminum storm door and the length of time needed to complete each task.
a) Calculate the cycle time needed to produce 320 doors in an eight-hour work day.
b) What is the minimum number of workstations that can be used on the line and still achieve the desired production rate? Balance the line and calculate its efficiency.
c) What is the maximum output possible with these data? The minimum?