The following information is available for three MPS items: Develop the material requirements plan for the next

Question:

The following information is available for three MPS items:Product A Product B Product C An 80-unit order is to be started in week 3. A 55-unit order is to be started

Develop the material requirements plan for the next 6 weeks for items D, E, and F. The BOMs are shown in Figure 11.43, and data from the inventory records are shown in Table 11.11.D (2) A E (1) F (2) D (1) B E (2) F (2) D (2) C E (2) F (2)Data Category Lot-sizing rule Lead time Safety stock Scheduled receipts Beginning inventory D FOQ = 150 3