8 The LINDO output in Figure 41 can be used to determine the critical path for Problem...

Question:

8 The LINDO output in Figure 41 can be used to determine the critical path for Problem 5. Use this output to do the following:

image text in transcribed

image text in transcribed

a Draw the project diagram.
b Determine the length of the critical path and the critical activities for this project.

Step by Step Answer: