8 The LINDO output in Figure 41 can be used to determine the critical path for Problem...
Question:
8 The LINDO output in Figure 41 can be used to determine the critical path for Problem 5. Use this output to do the following:
a Draw the project diagram.
b Determine the length of the critical path and the critical activities for this project.
Step by Step Answer: