An electric power utility forecasts that rt kilowatt-hours (kwh) of generating capacity will be needed during year
Question:
An electric power utility forecasts that rt kilowatt-hours (kwh) of generating capacity will be needed during year t (the current year is year 1). Each year, the utility must decide by how much generating capacity should be expanded. It costs ct(x) dollars to increase generating capacity by x kwh during year t. It may be desirable to reduce capacity, so x need not be nonnegative. During each year, 10% of the old generating capacity becomes obsolete and unusable (capacity does not become obsolete during its first year of operation).
It costs the utility mt(i) dollars to maintain i units of capacity during year t. At the beginning of year 1, 100,000 kwh of generating capacity are available. Formulate a dynamic programming recursion that will enable the utility to minimize the total cost of meeting power requirements for the next T years.
Step by Step Answer:
Operations Research Applications And Algorithms
ISBN: 9780534380588
4th Edition
Authors: Wayne L. Winston