In Figure 13.7, determine the combined requirements for subassembly S in each of the following cases: (a)

Question:

In Figure 13.7, determine the combined requirements for subassembly S in each of the following cases:

(a) Lead time for M1 is only one period.

(b) Lead time for M1 is three periods.