Steelco manufactures two types of steel at three different steel mills. During a given month, each steel
Question:
Steelco manufactures two types of steel at three different steel mills. During a given month, each steel mill has 200 hours of blast furnace time available.
Because of differences in the furnaces at each mill, the time and cost to produce a ton of steel differ for each mill, as listed in the file P04_66.xlsx. Each month, Steelco must manufacture at least 500 tons of steel 1 and 600 tons of steel