For a sand drain project (Figure 5.20), the following are given: Clay: Normally consolidated H c =
Question:
For a sand drain project (Figure 5.20), the following are given:
Clay: Normally consolidated
Hc = 5.5 m sone{way drainaged
Cc = 0.3
eo = 0.76
cv = 0.015 m2/day
Effective overburden pressure at the middle of clay layer = 80 kN/m2
Sand drain: rw = 0.07 m
rw = rs
de = 2.5 m
cv = cvr
A surcharge is applied as shown in Figure P5.13. Calculate the degree of consolidation and the consolidation settlement 50 days after the beginning of the surcharge application.
Figure 5.20
Figure P5.13.
Fantastic news! We've Found the answer you've been seeking!
Step by Step Answer:
Related Book For
Principles Of Foundation Engineering
ISBN: 9781337705028
9th Edition
Authors: Braja M. Das, Nagaratnam Sivakugan
Question Posted: