The tie rods from anchored sheet piles will be connected using a row of anchors, as shown

Question:

The tie rods from anchored sheet piles will be connected using a row of anchors, as shown in Figure 18.46a. Here H = 2.0 m, h = 1.25 m, B = 1.5 m, S' = 2.5 m, ϕ' = 32°, and γ = 17.5 kN/m3. The anchor plates are made of 100 mm thick reinforced concrete with a unit weight of 24.0 kN/m3.

Determine the ultimate holding capacity of the anchor using Ovesen and Stromann’s method.


Figure 18.46

Sand H -S'- S' (a) 0.5 Dense sand 0.4 0.3 Loose sand 0.2 0.1 0.5 1.0 1.25 (S' – B)/(H + h) (b) (Be - B)/(H + h)

Fantastic news! We've Found the answer you've been seeking!

Step by Step Answer:

Related Book For  book-img-for-question

Principles Of Foundation Engineering

ISBN: 9781337705028

9th Edition

Authors: Braja M. Das, Nagaratnam Sivakugan

Question Posted: