Consider the assembly line balancing problem represented by the network in Figure 917. The performance times are

Question:

Consider the assembly line balancing problem represented by the network in Figure 9–17. The performance times are shown above the nodes.

a. Determine a balance for C  15.

b. Determine a balance for C  20.

c. What appears to be the minimum cycle time that can be achieved using the number of stations you obtained in part (a)?

d. What appears to be the minimum cycle time that can be achieved using the number of stations you obtained in part (b)?