The construction of the p chart described in this chapter requires specification of both UCL and LCL

Question:

The construction of the p chart described in this chapter requires specification of both UCL and LCL levels. Is the LCL meaningful in this context? In particular, what does it mean when an observed value of p is less than the LCL? If only the UCL is used to signal an out-of-control condition, should the calculation of the UCL be modified in any way? (Hint: The definition of the Type 1 error probability, , will be different. The hypothesis test for determining if the process is in control is one-sided rather than two-sided.)

Fantastic news! We've Found the answer you've been seeking!

Step by Step Answer:

Related Book For  book-img-for-question

Production And Operations Analysis

ISBN: 9781478623069

7th Edition

Authors: Steven Nahmias, Tava Lennon Olsen

Question Posted: