The problem of lot sizing for the valve casing assembly described for Harmon Music Company in Section
Question:
The problem of lot sizing for the valve casing assembly described for Harmon Music Company in Section 8.2 was solved using the EOQ formula. Determine the lot sizing for the 10 periods using the following methods instead:
a. Silver–Meal.
b. Least unit cost.
c. Part period balancing.
d. Which lot-sizing method resulted in the lowest cost for the 10 periods?