Two jobs must be processed through four machines in the same order. The processing times in the

Question:

Two jobs must be processed through four machines in the same order. The processing times in the required sequence are Job 1 Job 2 Machine Time Machine Time A 5 A 2 B 4 B 4 C 6 C 3 D 3 D 5 Determine how the two jobs should be scheduled in order to minimize the total makespan, and draw the Gantt chart indicating the optimal schedule.

Fantastic news! We've Found the answer you've been seeking!

Step by Step Answer:

Related Book For  book-img-for-question

Production And Operations Analysis

ISBN: 9781478623069

7th Edition

Authors: Steven Nahmias, Tava Lennon Olsen

Question Posted: