We have n jobs with the ith requiring a random time X, to process. The jobs must

Question:

We have n jobs with the ith requiring a random time X, to process. The jobs must be processed sequentially and the objective is to stochastically maximize the number of jobs that are processed by a (fixed) time

(a) Determine the optimal strategy if X,SX+19 LR i=1,.,n-1.

(b) What if we only assumed that X, X+1 st i=1,.,n-1?