10.39 An assembly-line worker at Joseph Milners Fabrication Shop inserts Part A into Part B. A time...
Question:
• 10.39 An assembly-line worker at Joseph Milner’s Fabrication Shop inserts Part A into Part B. A time study was conducted and produced the following results in seconds: 8.4, 8.6, 8.3, 8.5, 8.7, 8.5.
What is the average cycle time?