12. A stop watch time study was made of an assembly task that involved four elements: (a)...

Question:

12. A stop watch time study was made of an assembly task that involved four elements:

(a) Calculate the normal task time.

(b) Calculate the standard time.

(c) What should be done with cycle2, element 3 in the study?

image text in transcribed

Allowance are 15 percent of the normal time.