2. The main objective(s) of production scheduling is/are:
(a) Consideration of due dates and avoiding delayed completion of jobs
(b) Taking care of throughput times; to maximize the time a job spends in the system, from the open- ing of a shop order till it closed
(c) Consideration and utilization of work centres
(d) All of the above