Between the flow shop scheduling and job shop scheduling to minimize the makespan, for the same problem

Question:

Between the flow shop scheduling and job shop scheduling to minimize the makespan, for the same problem size, the time taken for the job shop scheduling is that of the flow shop scheduling.

(a) Equal to

(b) Lesser than

(c) Greater than

(d) None of the above.