Consider the following problem in single machine scheduling with independent jobs. Job j 1 2 3 4
Question:
Consider the following problem in single machine scheduling with independent jobs.
Job —j 1 2 3 4 5 6 7 8 t. 5 12 8 10 3 15 8 6 di 10 16 11 16 6 25 12 14 W. 2 1 1 2 3 4 2 3 Obtain the optimal schedule for each of the following performance measures:
(a) To minimize mean flow time.
(b) To minimize the maximum lateness.
(c) To minimize weighted mean flow time.