Consider the following single machine scheduling problem.

Job — 1 2 3 4 5 6 Processing time (t1) 8 9 7 8 10 14 Due date dj 14 12 10 14 20 28 Determine the sequence which will minimize the maximum lateness (Linax). Also, determine the Lmax with respect to the optimal sequence.