In the job shop scheduling with 2 machines and n jobs, in the Gantt chart to minimize

Question:

In the job shop scheduling with 2 machines and n jobs, in the Gantt chart to minimize the makespan, a line with slope is drawn from the origin to the upper right corner by avoiding the regions.

(a) 15°

(b) 30°

(c) 45°

(d) 60°