11 Determine whether the full-capacity tunnel or the half-capacity tunnel should be constructed now. Solve the problem...
Question:
11 Determine whether the full-capacity tunnel or the half-capacity tunnel should be constructed now. Solve the problem by B/C ratio analysis using a 5% interest rate and a 50-year analysis period.There will be no tunnel lining repair at the end of the 50 years.
Consider the following typical noise levels in decibels (dBA):
140 – threshold of pain 130 –
120 – four-engine jet aircraft at 500 ft unmuffled motorcycle 110 –
100 – rock and roll band subway train at 20 ft 90 –
heavy traffic at 25 to 50 ft 80 –
vacuum cleaner 70 – dishwasher 60 – conversational speech at 3 ft 50 – business office 40 – home
a. Assume that you are responsible for designing a machine shop. How would you determine an acceptable level of noise? What costs and risks should you weigh?
b. What would your answer be for the design of a commercial aircraft?
Step by Step Answer:
Project Management Processes Methodologies And Economics
ISBN: 9781292039404
1st Edition
Authors: Avraham Shtub