= 2. Next, construct a control chart. Be sure to include some headroom above the upper control

Question:

= 2. Next, construct a control chart. Be sure to include some

“headroom” above the upper control limit to allow for any out-of-limit events that may be encountered. Also make the chart long enough horizontally to include all the data points in the table, plus a few more days of real-time data points that will need to be plotted as SPC tracking begins.