Question
Erie Company manufactures a small mp3 player called the Jogging Mate. The company uses standards to control its costs. The labor standards that have been
Erie Company manufactures a small mp3 player called the Jogging Mate. The company uses standards to control its costs. The labor standards that have been set for one Jogging Mate mp3 player are as follows:
During August, 10,530 hours of direct labor time were needed to make 19,500 units of the Jogging Mate. The direct labor cost totaled $58,968 for the month.
Required:
1. According to the standards, what direct labor cost should have been incurred to make 19,500 units of the Jogging Mate? By how much does this differ from the cost that was incurred? (Round Standard labor time per unit to 2 decimal places.)
Number of units manufactured 19,500
Standard labor time per unit
Total standard hours of labor time allowed
Standard direct labor rate per hour
Total standard direct labor cost
Actual direct labor cost
Standard direct labor cost
Total variance?unfavorable $ 0
2. Break down the difference in cost from (1) above into a labor rate variance and a labor efficiency variance. (Indicate the effect of each variance by selecting "F" for favorable, "U" for unfavorable, and "None for no effect (i.e., zero variance). Do not round intermediate calculations.)
Labor rate variance ___________
Labor efficiency variance ________
3. The budgeted variable manufacturing overhead rate is $4.5 per direct labor-hour. During August, the company incurred $52,650 in variable manufacturing overhead cost. Compute the variable overhead rate and efficiency variances for the month. (Indicate the effect of each variance by selecting "F" for favorable, "U" for unfavorable. and "None" for no effect (i.e., zero variance). Do not round intermediate calculations and round your final answers to nearest whole dollar.)
Variable overhead rate variance _________
Variable overhead efficiency variance _________
Standard Hours 30 minutes Standard Rate per Hour $5.80 Standard Cost $2.90
Step by Step Solution
There are 3 Steps involved in it
Step: 1
1 Number of units manufactured 19500 Standard labour time per unit 50 hour...Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started