Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

1. [10pts] A production line should be making 1200 units of product per hour while operating. In a 12hour shift, it is found that the

image text in transcribed
1. [10pts] A production line should be making 1200 units of product per hour while operating. In a 12hour shift, it is found that the line only operated 9.5 hours due to shift startup and shift end issues, changeovers, and major failures. During the 9.5 hours the line was operating it produced 9000 units (less than expected due to minor stoppages and some processes being run at a slower rate due to equipment issues), of which 5% were defective and had to be scrapped. Calculate OEE for the line. All work must be shown for credit

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Engineering Economy

Authors: William G. Sullivan, Elin M. Wicks, C. Patrick Koelling

15th edition

132554909, 978-0132554909

More Books

Students also viewed these General Management questions