1. (20 points) Give a full description of the scheduling problems denoted by the following a Bly notation shown below. (a) R3 rj, intree EU;
1. (20 points) Give a full description of the scheduling problems denoted by the following a Bly notation shown below. (a) R3 rj, intree EU; (b) | prmp, d | EC (c) Pm Pj = 1, chains | Cmax (d) 1 prec | EW; C