1. (9pts) Eco Friendly Designs has decided to open an office on the first floor of an office building in Pleasantville, CA They plan to be here for a while and rent more space to support future expansion as well as the possibility of expanding into the office space either above their current floor. The new manager, Mr Ingo, has hired you to install cabling and related equipment to connect every computer to a 100BaseT (Fast Ethernet) wired Ethernet LAN. Because their competitor, "Designs by Friendly Competitor has moved in next door (to the right of the floor plan). Mr. In He has provided the floor plan of the office space shown below and lets you know he currently has 10 full time employees. Create a plan that includes as a minimum: A list of all equipment required, including that for the equipment (telecommunications) room. a. b. If we assume every computer already had the "appropriate NIC card', what would that mean in Ethernet terminology (le. Speed, signal type, medium)? c Identify where 2 shared printers might be placed. d. Onthe plan, dra i the location of the telecom room ii show the horizontal runs. Remember keep cable lengths under 90 meters and specify whether they will be in the ceiling, the walls, in a raceway outside the walls or across the floor. Assume there is a dropped ceiling and estimate distances if necessary identify drops by placing an "X" where a wall plate would be attached ili e. Capability for growth. Eco Friendly Designs has a 5year lease. Their product is in hot demand in a growing industry. They expect to hire while at this site. You should be able to add several more computers (think in terms of 10%growth every every) and upgrade the LAN without building the network from scratch. Be sure you identify this on the plan. 25ft 48f