Question
1) A company that has a job shop production type, produces a certain product in batches with the average size of 200 units. The average
1) A company that has a job shop production type, produces a certain product in batches with the average size of 200 units. The average set up time is 3 hours for each batch. The number of operations per batch is 7. The operation time is 10 mins per piece. The non-operation time is 6 hr. The plant has 18 machines that are working all the available time (100% utilization). Assume the company works 40hr/week.
A) determine the weekly plant production rate. B) determine the work-in-process for the plant.
2) Repeat problem 1 if the average mean time between failure for all machines is 20 hours and the average time needed to repair the machines is 2 hours
I need typed answer
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started