Question
1. A project has an expected completion time of 25 weeks and a variance of 25. What is the probability that the project can be
1. A project has an expected completion time of 25 weeks and a variance of 25. What is the probability that the project can be finished in greater than 30 weeks?
0.42
0.84
0.16
1
2. In a queueing system, the elapsed time between consecutive arrivals is 3 minutes on average. The mean arrival rate is
20 arrivals per hour.
30 arrivals per hour.
20 arrivals per minute.
3 arrivals per minute.
3. Mona is responsible for two machines whose average time between breakdowns is 10 days, distributed according to the exponential distribution. It takes about 1 day to repair one machine. Find the value of probability that the system is idle.*
0.82
0.18
0.91
None of the above
4. The overall significance of a regression model is tested using an F-test. If c is the level of significance, the model is significant if*
the F-value is low.
the value c is low.
the slope is lower than the intercept.
the p-value of the F-value is lower than c .
5. The overall significance of a regression model is tested using an F-test. If c is the level of significance, the model is significant if*
the F-value is low.
the value c is low.
the slope is lower than the intercept.
the p-value of the F-value is lower than c .
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started