1. A team's capacity in the sprint, i.e. the average total of story points it can complete, is called Blank 1. 2. A Blank 1
1. A team's capacity in the sprint, i.e. the average total of story points it can complete, is called Blank 1.
2. A Blank 1 is assigned to numbers with no units added, obtained by comparison, that allow a measure of the complexity and/or size of a requirement or user story.