1. In a winch assembly plant at Curt Manufacturing, the winch assembly work cell for the winch mount handle has a demand of 200units an
1. In a winch assembly plant at Curt Manufacturing, the winch assembly work cell for the winch mount handle has a demand of 200units an hour. Two feeder cells supply the two winch component parts CRT31005 and CRT 31006 to the assembly cell (one CRT31005 andone CRT31006 for each winch mount handle). Standard containers willhold 20 CRT31005’s or 10 CRT31006’s. It takes 10 minutes to fill upa container with CRT31005’s and 20 minutes to full up a containerwith CRT31006’s. The transit time to the assembly work cell is 5minutes for both CRT31005 and CRT31006; the policy variable set bymanagement that reflects possible inefficiency in the system is 0.. Set up a Kanban control system for the assembly process.
2.CS Unitec has experienced an increase in demand for three ofits products: circular saw blades, table saw blades, and miter sawblades. The monthly requirements are 7,200 circular saw blades,3,600 table saw blades, and 3,600 miter saw blades. The firm works30 days a month, eight hours per day. The time required to assembleeach of its products is approximately the same. Determine a modelsequence for the firm’s assembly line which will smooth out theproduction of each of its three products.
Step by Step Solution
3.38 Rating (160 Votes )
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started