Answered step by step
Verified Expert Solution
Question
1 Approved Answer
1: In an Electronics Manufacturing Company, a quality control engineer selected a sample of size 180 on each of 19 consecutive days at randomly chosen
1: In an Electronics Manufacturing Company, a quality control engineer selected a sample of size 180 on each of 19 consecutive days at randomly chosen times. The data related to the proportion of the defectives on each of the 19 days is given below. Calculate UCL and LCL for the p-bar chart. Sample Proportion of Sample Proportion of Sample Proportion of Sample Proportion of Number Defectives Number Defectives Number Defectives Number Defectives 1 0.1901 6 0.0030 11 0.1307 16 0.0498 2 0.1403 7 0.1632 12 0.1738 17 0.1612 3 0.1629 8 0.0853 13 0.1571 18 0.1004 4 0.1804 9 0.1685 14 0.1344 19 0.0119 5 0.0556 10 0.1863 15 0.1422 The following four questions are based on PROBLEM 1: (1) What is the value of ? (a) 0.3426 (b) 0.1262 (c) 0.0691 (d) 0.2268 (2) What is the value of s? (a) 0.0519 (b) 0.0892 (c) 0.0247 (d) 0.2268 (3) What is the value of UCL(p)? (a) 0.2004 (b) 0.3218 (c) 0.1472 (d) 0.3817 (4) What is the value of LCL(p)? (a) 0.1209 (b) 0.2332 (c) 0.0519 (d) 0.099
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started