Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

1. Introduction Request for Proposals: A public parking lot in Beaconsfield Group project, ENGR 301 H, fall 2023, Dr. R. Tadayon This is a fictitious

1. Introduction Request for Proposals: A public parking lot in Beaconsfield Group project, ENGR 301 H, fall 2023, Dr. R. Tadayon This is a fictitious project. The City of Montreal has decided to plan, design, and construct a public parking lot in Beaconsfield (West Island). To encourage residents of Beaconsfield to use electric vehicles (EV), the City has decided to install several "charging stations" in this parking lot. The City has released a Request for Proposals (RFP) for a scoping of the feasibility of this project. Your team has decided to submit a proposal. Solid cost estimates and project plans, including the timeline for completion, are critical to the City's ability to evaluate this initiative. This proposal should be considered a first scoping report that lays out the approach with sufficient detailed plans and costs. You should prove that your team has (1) the project management capabilities and (2) ample technical knowledge to conduct engineering economic analyses. To be competitive in this RFP, your proposal must provide a description of the various elements of this design project, including a breakdown of the components of the activities of this project, the duration and dependencies of this project, and the costing. Also, your proposal should address other factors that need to be considered, including environmental, ethical, and social factors. The location of the proposed project is shown on the following map (Google Maps). The parking lot should have an entrance and an exit separated by a booth. The parking lot should have a capacity of n vehicles with m charging stations. Here, n and m are integers obtained using the following formulas (round them to the nearest integers). n = 50+9 your group number ; m = 4 + your group number
image text in transcribed
image text in transcribed
Request for Proposals: A public parking lot in Beaconsfield Group project, ENGR 301 H, fall 2023, Dr. R. Tadayon 1. Introduction This is a fictitious project. The City of Montreal has decided to plan, design, and construct a public parking lot in Beaconsfield (West Island). To encourage residents of Beaconsfield to use electric vehicles (EV), the City has decided to install several "charging stations" in this parking lot. The City has released a Request for Proposals (RFP) for a scoping of the feasibility of this project. Your team has decided to submit a proposal. Solid cost estimates and project plans, including the timeline for completion, are critical to the City's ability to evaluate this initiative. This proposal should be considered a first scoping report that lays out the approach with sufficient detailed plans and costs. You should prove that your team has (1) the project management capabilities and (2) ample technical knowledge to conduct engineering economic analyses. To be competitive in this RFP, your proposal must provide a description of the various elements of this design project, including a breakdown of the components of the activities of this project, the duration and dependencies of this project, and the costing. Also, your proposal should address other factors that need to be considered, including environmental, ethical, and social factors. The location of the proposed project is shown on the following map (Google Maps). The parking lot should have an entrance and an exit separated by a booth. The parking lot should have a capacity of n vehicles with m charging stations. Here, n and m are integers obtained using the following formulas (round them to the nearest integers). n=50+9yourgroupnumber;m=4+yourgroupnumber oposal Submission Contents All proposals are required to provide the following information: 3.1 A description of the team, their roles, and qualifications, as well as any sub-contractors that will be hired. 3.2 A description of the approach/methods for the preliminary assessment and design of the project, and a clear and extensive explanation of each project activity including their duration. 3.3 A list of activities (including preliminary assessment and design, procurement, construction, etc.), with all dependencies. The rationale for these dependencies should be clearly explained. The activities and dependencies should be illustrated in a precedence diagram (AON). 3.4 An overview schedule in Gantt format showing all activities and project milestones, project meetings, interim reports, and progress reports required. Also, an indieation of the critical path is needed. 3.5 Description of assumptions, references, and calculations applied in developing a detailed cost estimate of the project. Include a schedule of fees for staff to be assigned to the project development and construction. 3.6 A description of the professional, social, environmental, and ethical components of the project

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access with AI-Powered Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Understanding Business Ethics

Authors: Peter A. Stanwick, Sarah D. Stanwick

3rd Edition

9781506303239

Students also viewed these General Management questions